Information Bulletin: Adoption of BC Electrical Code, 2021 Edition |
IB-EL 2022-01 |
|
|
Information Bulletin: Approved certification marks for electrical products |
B-E3 071019 3 |
Rev 11 |
|
Information Bulletin: Minimum requirements retrofit of luminaires to include the use of light emitting diodes |
IB-EL 2017-01 |
Rev 2 |
|
Information Bulletin: BC Electrical Code - Section 2: Requirements to de-energize electrical equipment |
IB-EL 2013-01 |
Rev 2 |
|
Information Bulletin: Approval of manufactured homes and factory-built structures |
IB-EL 2015-02 |
Rev 3 |
|
Information Bulletin: Incident and hazard reporting - Electrical |
IB-EL 2017-03 |
Rev 3 |
|
Information Bulletin: Underground installations |
IB-EL 2020-01 |
Rev 1 |
|
Information Bulletin: Recreational vehicles |
IB-EL 2015-01 |
Rev 2 |
|
Information Bulletin: Electrical Safety Regulation application to public utilities |
IB-EL 2017-04 |
Rev 3 |
|
Information Bulletin: Minimum requirements for upgrading of electrical systems |
B-E3 091214 2 |
Rev 2 |
|
Directive: Exemptions to public utilities |
D-EL 2017-01 |
Rev 2 |
|
Information Bulletin: Load calculations for row-housing |
IB-EL 2014-01 |
Rev 2 |
|
Information Bulletin: Encapsulated mass timber construction and the electrical code |
IB-EL 2020-02 |
|
|
Information Bulletin: Minimum requirements for the installation of step up – step down single phase low voltage transformers |
IB-EL 2017-02 |
Rev 2 |
|
Information Bulletin: Temporary and permanent services for construction power |
IB-EL-2016-03 |
Rev 2 |
|
Directive: BC Electrical Code Section 14 - Protection and Control |
D-EL 2016-07 |
Rev 1 |
|
Directive: Safety Standards General Regulation - Electrical work in emergencies |
D-EL 2018-01 |
Rev 1 |
|
Directive: BC Electrical Code Section 2 general rules |
D-EL 2016-02 |
Rev 1 |
|
Directive: High voltage installations |
D-E3 090313 1 |
Rev 1 |
|
Information Bulletin: Determining minimum service or feeder conductor size for single dwellings and single dwelling units of row housing or apartment and similar buildings |
IB-EL 2016-07 |
Rev 1 |
|
Directive: BC Electrical Code Section 4 - Conductors |
D-EL 2016-04 |
Rev 1 |
|
Directive: BC Electrical Code Section 76 – Temporary Wiring |
D-EL 2016-03 |
Rev 1 |
|
Directive: BC Electrical Code Section 6 - Services and Service Equipment |
D-EL 2016-05 |
Rev 1 |
|
Directive: Supervision requirements under electrical installation permits |
D-E3 060509 2 |
Rev 2 |
|
Directive: BC Electrical Code Section 26 (installation of electrical equipment) |
D-EL 2016-01 |
Rev 1 |
|
Information Bulletin: Section 4 - Conductors |
IB-EL 2016-06 |
Rev 1 |
|
Information Bulletin: Protection of electrical raceways and cables under roof systems and decks |
IB-EL 2015-05 |
Rev 1 |
|
Information Bulletin: High voltage installations |
IB-EL 2016-02 |
Rev 1 |
|
Information Bulletin: BC Electrical Code Section 76 -Temporary Wiring |
IB-EL 2011-01 |
Rev 1 |
|
Information Bulletin: Overhead line guidelines |
B-E3 090312 1 |
Rev 2 |
|
Information Bulletin: Guidelines for determining hazardous area classifications |
IB-EL 2016-01 |
Rev 1 |
|
Information Bulletin: Section 2 – General Rules |
IB-EL 2016-05 |
Rev 1 |
|
Information Bulletin: New permit category: extra low voltage / low energy decals |
IB-EL 2013-02 |
Rev 2 |
|
Information Bulletin: Minimum Requirements for Upgrading of Electrical Systems Single Family Dwelling |
B-E3 091214 2 |
Rev 02 |
|
Information Bulletin: Minimum requirements retrofit of fluorescent fixtures |
B-E3 100224 1 |
Rescinded |
|
Information Bulletin: Voluntary Disclosure Program (VDP) |
IB-CE-2019-01 |
|
|
Information Bulletin: Adoption of BC Electrical Code, 2018 Edition |
IB-EL 2019-01 |
|
|
Information Bulletin: Emergency – natural disaster protocol for electrical and gas equipment safety (e.g. – fire, flood, earthquake, landslide) |
IB-EL/GA 2015-04 |
Rev 1 |
|
Information Bulletin: Contractor Installation Permit Value Amendment Criteria |
IB-AT-2019-01 |
|
|
Information Bulletin: Electric vehicle energy management systems |
IB-EL 2018-01 |
|
|
Information Bulletin: Compliance and enforcement fees criteria |
IB-CE-2018-02 |
|
|
Information Bulletin: Compliance audits |
IB-CE-2018-01 |
Rev 1 |
|
Information Bulletin: Transitional requirements under Bill 13 – Safety Standards Amendment Act, 2016 for equipment located in pipelines and oil & gas facilities |
IB-A1-2016-02 |
|
|
Information Bulletin: Pending amendments to the Safety Standards Act under Bill 13 – Safety Standards Amendment Act, 2016 |
IB-A1-2016-01 |
|
|
Information Bulletin: Operating permits |
IB-EL 2015-03 |
Rev 1 |
|
Directive: Determining minimum service or feeder conductor size for single dwellings and single dwelling units of row housing or apartment and similar buildings |
D-EL 2016-06 |
Rescinded |
|
Information Bulletin: Application of polyurethane spray foam insulation on non-metallic-sheathed cables |
B-E3 070327 1 |
Rev 1 |
|
Information Bulletin: Responsibilities of field safety representatives |
B-E3 060609 1 |
Rescinded |
|
Information Bulletin: Homeowner Permit – Scope of Work |
IB-EL 2016-08 |
|
|
Information Bulletin: Services and service equipment |
IB-EL 2012-03 |
Rev 1 |
|